Unfinished Object
Quote of The Day
Navigation
Home |
Where I Play
Categories
Read
Lurk
Inspire
Crafting For A Cause
Green
Diversions
Photos
Monthly Archives
- August 2008
- July 2008
- June 2008
- May 2008
- April 2008
- March 2008
- February 2008
- January 2008
- December 2007
- November 2007
- October 2007
- September 2007
- August 2007
- July 2007
- June 2007
- May 2007
- April 2007
- March 2007
- February 2007
- January 2007
- December 2006
- November 2006
- October 2006
- September 2006
- August 2006
- July 2006
- June 2006
- May 2006
- April 2006
- March 2006
- February 2006
- January 2006
Site Credits
Powered by:
ExpressionEngine
Design by:
BlogMoxie
Due to some scheduling problems, we didn’t get as much done on the bathroom as we had hoped. By ‘scheduling problems’ I mean that we didn’t want to seal the floor and curb, and tile the floor prior to my plumber step-brother’s repair of the piping. The house is plumbed with polybutylene piping, a material that has been balled up in lawsuits for years because of its tendency to leak at the fittings. I’ve had several leaks in the house but they were all associated with the copper leaders at the valves and not the poly-pipe. I repaired them to the best of my ability with a compression fitting that clearly stated on the package ‘not for in-wall use’, and they’ve held – some for nearly ten years. Still, with poly’s reputation, and the dire warning on the fittings I’d rather a pro make it as right as possible (without re-plumbing the whole house) while we have the wall open.
D finished the knee wall, I hung the wall insulation, we installed wallboard where we could and then I set about constructing the curb. After some discussion the decided on method was to lay two courses of bricks, and then stucco over them. It took me far longer than it probably should have but we were both pleased with the outcome. This took us to Saturday afternoon and a natural stopping point to wait for the plumbing to be done. Certainly there were things we could do; finish the ceiling drywall, remove the toilet, install drywall on the back of the knee wall, remove the wallpaper and prep for the future paint job, etc. But we were both easily swayed by the lure of other activities and called it quits until ‘J the plumber’ can get by.
D parked himself at the computer and I sat down at the sewing machine. I was a ‘makin’ fool’ this weekend, completing three journals, two ‘cover-ups’, a tote, and a ‘roll’...most of which I can’t show you yet as they are all ‘promises kept’ (albeit slow promises) and are jetting their way to their new homes as I type. There is however a straggler, a journal that didn’t make the cut, and that I can share.
It is the latest item that ‘needs a home’ so if it ‘blows your skirt up’ speak up. It is navy and cream cotton with just a touch of red, and covers a lined journal (readily available from Barnes & Noble). This one is a considerable improvement over the first round of journals and in my opinion more successful. Like the little smocks these are a satisfying and quick project, not to mention a great way to consume the stash. So help me out will ya? Give this poor little guy a home. Update: Donna kindly gave it a home ... thanks Donna.
Plain Old Everyday • Homeless Crafts • Home Improvement • Crafts & Swaps • Permalink

